08-23-2018, 08:35 PM
The docking clamps are done.
I wont attach them to the armature plugs until the styrene is in place, as they they need to be positioned over the styrene on the top side of the ship.
The parts layout is done and I will look at transferring it over to the plastic in the next few days.
I have also had my layouts printed out full size onto paper so that I can use them as templates for locating the (many!) parts as accurately as possible.
I wont attach them to the armature plugs until the styrene is in place, as they they need to be positioned over the styrene on the top side of the ship.
The parts layout is done and I will look at transferring it over to the plastic in the next few days.
I have also had my layouts printed out full size onto paper so that I can use them as templates for locating the (many!) parts as accurately as possible.

