07-01-2015, 08:14 PM
July Updates - 2015
Hi my fellow model builders!
This month's updates are now posted for your enjoyment. I have pretty much been doing a lot of clean up with the port side framework. I'm getting all of the tension rod assemblies in place as well as the port side mark light bars which run along the length of the model. I've also added all of the panel frame details to the sides of each of the panel frames. Everything is pretty much in place and all I have to do now is connect all of the wires and do a lighting test to make sure everything works okay. The only part I didn't detail as of yet is between the top tier 2nd and 3rd panel frames. This is because I will have to cut into the tubing to allow the armature tower to fit in between these panels. I'm a little bit nervous about cutting into these tubes just because I don't want to ruin anything. But this has to be done in order for the ship to be supported inside the dock.
In the meantime, I will be painting up all of the added details that I've put on this last month to match the rest of the dock model. In the updates there are 32 new pics for this month. I've taken more photos to show how the tension rods are added one by one into the structure. It takes about 40 to 45 minutes to complete one panel frame. This is mainly because of all of the small parts I'm using to build this part of the dock. I can't tell you how many times I've wound up dropping parts while trying to put them all in place. I've also been doing some piece counting for the model. There are 9 parts to each of the tension rods. 2 mounting nuts, 2 mounting bolts, 2 washers 2 turnbuckle sleeves and one tension rod. There are 12 tension rods on each panel frame. So just for the tension rod assemblies alone there are 108 pieces per panel frame. 42 panel frames total including the port and starboard frameworks. This equals 4,536 individual pieces just for the panel frames alone. At the end of the entire build I will give you a complete total of all the individual parts needed for this model.
In other areas, I have scratch built some support clamps that are needed to hold the mark lighting rods in place on the outside of the port framework. These clamps were all cemented to the outside of the dock and aligned so that the entire length of the rod would appear straight over the entire length of the dock. The mark light rods are then snapped into the clamps holding them in place. Next I will be doing the wiring for these lights and then do a light test. After everything looks good I can then paint all of these parts to match the dock. I can finally move to get the Enterprise in place. Hope you enjoy all of the pics for this months. As always if you have any comments or questions I'd be happy to hear from you. See you next month! Be safe!
Mark
http://www.NemVia.com
Hi my fellow model builders!
This month's updates are now posted for your enjoyment. I have pretty much been doing a lot of clean up with the port side framework. I'm getting all of the tension rod assemblies in place as well as the port side mark light bars which run along the length of the model. I've also added all of the panel frame details to the sides of each of the panel frames. Everything is pretty much in place and all I have to do now is connect all of the wires and do a lighting test to make sure everything works okay. The only part I didn't detail as of yet is between the top tier 2nd and 3rd panel frames. This is because I will have to cut into the tubing to allow the armature tower to fit in between these panels. I'm a little bit nervous about cutting into these tubes just because I don't want to ruin anything. But this has to be done in order for the ship to be supported inside the dock.
In the meantime, I will be painting up all of the added details that I've put on this last month to match the rest of the dock model. In the updates there are 32 new pics for this month. I've taken more photos to show how the tension rods are added one by one into the structure. It takes about 40 to 45 minutes to complete one panel frame. This is mainly because of all of the small parts I'm using to build this part of the dock. I can't tell you how many times I've wound up dropping parts while trying to put them all in place. I've also been doing some piece counting for the model. There are 9 parts to each of the tension rods. 2 mounting nuts, 2 mounting bolts, 2 washers 2 turnbuckle sleeves and one tension rod. There are 12 tension rods on each panel frame. So just for the tension rod assemblies alone there are 108 pieces per panel frame. 42 panel frames total including the port and starboard frameworks. This equals 4,536 individual pieces just for the panel frames alone. At the end of the entire build I will give you a complete total of all the individual parts needed for this model.
In other areas, I have scratch built some support clamps that are needed to hold the mark lighting rods in place on the outside of the port framework. These clamps were all cemented to the outside of the dock and aligned so that the entire length of the rod would appear straight over the entire length of the dock. The mark light rods are then snapped into the clamps holding them in place. Next I will be doing the wiring for these lights and then do a light test. After everything looks good I can then paint all of these parts to match the dock. I can finally move to get the Enterprise in place. Hope you enjoy all of the pics for this months. As always if you have any comments or questions I'd be happy to hear from you. See you next month! Be safe!
Mark
http://www.NemVia.com
"... once it's activated, there's no way to stop it!" - Scotty - DMa

