05-01-2015, 11:37 AM
May Updates - 2015
Well, this month I wasn't able to get as far as I would've liked to. I had several things I had to redo on the Enterprise model before I could start the wiring. I needed to add the Hanger bay doors to the back of the ship so they are in the open position. I also added a few more lightis to the hanger bay to enhance their lighting effects. But my primary task was to make sure that I was able to get the Armature mounted into the sauce and also make sure it would hold the ship up without bendig or bouncing too far up and down. The Enterprise does have some weight to it so I wanted to make sure the armature was holding the ship at an even keel. I also needed to start the wiring and have it feed through the armature up into the Drydock and down to the control panel base. This is now easy task as there are many wires to run through the ship. If this was mounted from below on the engineering deck it would a lot easier. But this ship needs to appear to be floating inside the dock and this is the only way to do it.
So I spent most of this last month doing a lot of soldering and wire running. Then after the wires were run thorugh the armature I needed to test that the ligthting circuits were working, then lable all of the wiring and the voltage for it's final connections to the power sources. So, I got the Engineering section wired up as well as most of the upper and lower saucer pieces. I am waiting for a shipment of LEDs to complete the thruster wiring for the Main deflector housing. I was able to get the main deflector dish wired up and working. I have lighting tests pics for some of the ship's lighting. By next month's update I will have the Enterprise resting inside her drydock and then I can add the Port side of the dock to the model. Hang in there gang. It's getting closer to being finished. I have 16 pics int the May Updates page. Check 'em out and enjoy! See you next month.
Mark
http://www.NemVia.com
Well, this month I wasn't able to get as far as I would've liked to. I had several things I had to redo on the Enterprise model before I could start the wiring. I needed to add the Hanger bay doors to the back of the ship so they are in the open position. I also added a few more lightis to the hanger bay to enhance their lighting effects. But my primary task was to make sure that I was able to get the Armature mounted into the sauce and also make sure it would hold the ship up without bendig or bouncing too far up and down. The Enterprise does have some weight to it so I wanted to make sure the armature was holding the ship at an even keel. I also needed to start the wiring and have it feed through the armature up into the Drydock and down to the control panel base. This is now easy task as there are many wires to run through the ship. If this was mounted from below on the engineering deck it would a lot easier. But this ship needs to appear to be floating inside the dock and this is the only way to do it.
So I spent most of this last month doing a lot of soldering and wire running. Then after the wires were run thorugh the armature I needed to test that the ligthting circuits were working, then lable all of the wiring and the voltage for it's final connections to the power sources. So, I got the Engineering section wired up as well as most of the upper and lower saucer pieces. I am waiting for a shipment of LEDs to complete the thruster wiring for the Main deflector housing. I was able to get the main deflector dish wired up and working. I have lighting tests pics for some of the ship's lighting. By next month's update I will have the Enterprise resting inside her drydock and then I can add the Port side of the dock to the model. Hang in there gang. It's getting closer to being finished. I have 16 pics int the May Updates page. Check 'em out and enjoy! See you next month.
Mark
http://www.NemVia.com
"... once it's activated, there's no way to stop it!" - Scotty - DMa

